Gishtkuprik Border Crossing to Increase Throughput Capacity
Following reconstruction, the Gishtkuprik checkpoint on the Uzbekistan-Kazakhstan border will be able to serve up to 70,000 people per day, and up to 100,000 during peak periods. The opening is scheduled for December 2026.

In November 2026, the reconstruction of the Gishtkuprik crossing, known in Kazakhstan as Chernyaevka, on the Uzbekistan-Kazakhstan border was completed. It is located in the Tashkent District of the Tashkent Region, opposite the Kazakh checkpoint Zhibek Zholy. On the Uzbek side, the territory was expanded, customs and border control systems were updated, and a Z Portal inspection complex for passenger vehicles was installed.
For passengers and transport, "green" and "red" corridors have been provided. The checkpoint also features separate lanes for buses, solar panels have been installed, and parking infrastructure has been upgraded. In Kazakhstan, two passenger terminals were built, and the checkpoint was equipped with separate solutions for passenger vehicles and buses.
On November 17, the Deputy Chairman of the Uzbekistan Customs Committee, Otabek Ibrokhimov, announced on the Uzbekistan 24 TV channel the imminent opening of Gishtkuprik and Dovut Ota. The committee's press service clarified that traffic through both checkpoints is planned to resume in December 2026. The exact opening date was not specified.




